关于公司
Production at the historical Bunker Hill Mine began in 1885 and ran for over 95 years. It was a lead metal mine with silver and zinc produced as a by-product. The amount of silver historically produced now represents a significant potential at Bunker Hill and across the Coeur d’Alene Mining District. The district has yielded a historic silver production of over 1.2 billion ounces, with the Bunker Hill Mine accounting for nearly 15% of the silver production. Given the historical data analyzed, we believe that the historical Bunker Hill mine has the potential to be re-started as one of the largest high-grade silver mines in the world and we have the exclusive lease and option to purchase it.
US
未知
未验证公司
业务透明度
- 未验证公司信息
- 向他们的客户询问评论
- 没有回复负面评论